Shed and drainage

Late May to July - the shed, concrete poured for the top of the steps, a place for the bins and the shed slab.  Also build the rest of the steps and did a bit of drainage (70 metres of trenches dug by hand before being filled with agi pipe and 2 metres of 20ml gravel!!!) after the shed was finished.