Late May to July - the shed, concrete poured for the top of the steps, a place for the bins and the shed slab. Also build the rest of the steps and did a bit of drainage (70 metres of trenches dug by hand before being filled with agi pipe and 2 metres of 20ml gravel!!!) after the shed was finished.
Sunday, July 26, 2015
Ramp built
On the 16th February John, Joey and Dave came down and built the ramp on the northern side of the house to give access to the back yard.
Subscribe to:
Posts (Atom)
